Arith / CONCEPT
Joint Fresh-Ladder Completion
Several interfaces can jointly repair the complete hole left by deleting a saturated prime chain. The repair uses fixed roots and genuinely fresh numerical labels from the same original family.
Closed
DIRECT PREREQUISITES1
DIRECT CONSEQUENCES0
PROOF DEPTH15
DOCUMENT LINKS1
A joint root repair constructs a smaller whole cover
RELATIONSHIP ATLAS
Every connection, in context.
Direct recorded relationships
Proof dependencyStructural affinityDocument link
Certified topology / UPSTREAM
Prerequisites
Certified topology / DOWNSTREAM
Consequences
None recorded in this release.
RELATED KNOWLEDGE
Structural connections
- Adjacent Prime-Height Profile Exchangestructural-affinity · Closed
- Arith: Arithmetic Coordinatesstructural-affinity · Closed
- Fixed Collision Exceptionsstructural-affinity · Closed
- Fresh Completion of a Complete Prime Chainstructural-affinity · Closed
- Height-Coded Prime Absorptionstructural-affinity · Closed
- Prime-Root Compression and Original Inventorystructural-affinity · Closed
- Single-Chain Cofactor Boundstructural-affinity · Closed
- Single-Chain q-Ladder Capacitystructural-affinity · Closed
Documents & exposition
Other authored & advisory relationships
None recorded in this release.
LIBRARY / RELEASE VERSIONS
Content history
Loading release versions...
Browse the archiveCertified provenance