ConceptDynamics / CONCEPT
Signed time subtracts from actual beam cuts
Signed time transports actual beam cuts by subtraction on the existing row colimit.
Closed
DIRECT PREREQUISITES1
DIRECT CONSEQUENCES1
PROOF DEPTH15
DOCUMENT LINKS0
Evaluate cut subtraction on each natural stage.
RELATIONSHIP ATLAS
Every connection, in context.
Direct recorded relationships
Proof dependencyStructural affinityDocument link
Certified topology / UPSTREAM
Prerequisites
Certified topology / DOWNSTREAM
Consequences
RELATED KNOWLEDGE
Structural connections
- Actual beam images in the native right-row colimitstructural-affinity · Closed
- Actual finite graph words give chronological rectangular RS paths and exact scalar-extended endpoint mapsstructural-affinity · Closed
- Actual relabel row matrices equal the reduced forward gyrationstructural-affinity · Closed
- Counted-edge ray images and intrinsic endpoint multiplicitiesstructural-affinity · Closed
- Dependent positive words transport actual beam coordinatesstructural-affinity · Closed
- Finite graph relabels preserve actual beam coordinatesstructural-affinity · Closed
- Functorial whole-set image on the actual geometric completionstructural-affinity · Closed
- The full native beam action of a literal word and timestructural-affinity · Closed
- The same time/id edge in every finite presentation basis measures actual primitive-orbit countstructural-affinity · Closed
Documents & exposition
None recorded in this release.
Other authored & advisory relationships
None recorded in this release.
LIBRARY / RELEASE VERSIONS
Content history
Loading release versions...
Browse the archiveCertified provenance