Quantum / CONCEPT
Occupation Physical Preparation
Occupation histories admit actual sequential pure-state circuits on one common memory, and their maximum cut rank is the attained least memory dimension.
Closed
DIRECT PREREQUISITES1
DIRECT CONSEQUENCES0
PROOF DEPTH5
DOCUMENT LINKS1
Every feasible cut size is bounded by the maximum
RELATIONSHIP ATLAS
Every connection, in context.
Direct recorded relationships
Proof dependencyStructural affinityDocument link
Certified topology / UPSTREAM
Prerequisites
Certified topology / DOWNSTREAM
Consequences
None recorded in this release.
RELATED KNOWLEDGE
Structural connections
- Head Occupation Gram Constructionstructural-affinity · Closed
- Legal Markov block weights and persistent mixture minorsstructural-affinity · Closed
- Padding Circuitstructural-affinity · Closed
- Padding Residual Actionstructural-affinity · Closed
- Padding Residual Gramstructural-affinity · Closed
- Padding Transitionstructural-affinity · Closed
- Phase History Boundstructural-affinity · Closed
- Physical Gram Necessitystructural-affinity · Closed
- Sequential Occupation Historystructural-affinity · Closed
- Sequential Register Circuitstructural-affinity · Closed
- Stationary Occupation Attainmentstructural-affinity · Closed
- Tight penalty coefficients for the QUBO reformulations of max k-cutstructural-affinity · Closed
Documents & exposition
Other authored & advisory relationships
None recorded in this release.
LIBRARY / RELEASE VERSIONS
Content history
Loading release versions...
Browse the archiveCertified provenance